Phase 1 · Before assembly
Prepare and verify every production input.
Boards, components, solder paste, moisture-sensitive devices and traceability requirements are released together.
PCB assembly equipment
Follow the complete equipment route from material control and SMT through DIP, soldering, inspection, test, conformal coating, box build and final QA.
Project-specific PCBA equipment flow
This is a reference workflow—not a fixed machine count for every order. The exact SMT, THT/DIP, protection, test and final-assembly route is selected from your BOM, board design, inspection plan and finished-product requirements.
Phase 1 · Before assembly
Boards, components, solder paste, moisture-sensitive devices and traceability requirements are released together.
Phase 2 · SMT front end
Board entry, surface condition, stencil printing and paste verification are completed before placement starts.
Phase 3 · SMT main line
Yamaha placement platforms, controlled reflow, AOI and project-specific X-ray form the core SMT route.
Phase 4 · Through-hole branch
The route is configured around the through-hole component mix and approved soldering method.
Phase 5 · Protection and electrical test
Cleaning, depaneling, coating, programming and electrical tests are selected from product requirements.
Phase 6 · Final assembly and shipment
The final route connects product identification, box build, outgoing quality control and shipment packaging.
Featured systems
The full route is shown above. This interactive area highlights six representative systems with the specifications currently listed on the equipment page.
Fully automatic, high-precision solder paste printing prepares the board for repeatable component placement and SPI verification.
Why equipment matters
Equipment alone does not guarantee a reliable PCBA. The operating value comes from documented setup, trained operators, incoming material control, inspection feedback and traceability across the process.
Explore the 19 quality checkpointsEquipment directory
Open each phase to review the production and inspection equipment. Items marked “as required” are selected according to the board, component, protection and test plan.
Inspection feedback loop
The dedicated process page preserves the complete 19-step sequence. On the equipment page, the key point is how inspection results connect back to process decisions.
Start with your files
Upload Gerber and BOM files with your quantity, component and inspection requirements. Our team will review the project and identify the relevant process and equipment path.
Share the board, component mix, volume and required inspection or test scope.